Carlynton

Plans advance for Bridgeville butterfly-pollinator garden

Kellen Stepler
By Kellen Stepler
2 Min Read Nov. 12, 2024 | 1 year Ago
Go Ad-Free today

A vacant lot along Baldwin Street in Bridgeville soon will be repurposed into a butterfly-pollinator garden.

Council on Nov. 11 authorized repurposing the lot, which is behind the Beer Warehouse, next spring.

The borough’s planning commission recommended the lot be used for a butterfly pollinator garden, according to Manager Joe Kauer.

According to borough documents, Bridgeville acquired the vacant lot through the FEMA Flood Buyout Program for passive open space and gardens. Over the past couple of months, the Planning Commission discussed a concept to transform the lot into a garden.

Planting costs are estimated at $904.

It’s anticipated that the public works department could prepare the site, install a fence and add topsoil, according to borough documents. Borough officials would then organize a volunteer planting day in the spring, like last year’s tree planting at another lot in the 600 block of Baldwin Street.

Also at the meeting

Council also took the following actions at its meeting Nov. 11:

• Authorized applying for a community development block grant to upgrade water drinking fountains at Triangle and Cook School parks.

• Accepted the $99,000 bid from Independent Enterprises, Inc., for the Bluff Street Extension Slope Stabilization and Retaining Wall improvements project. The Pittsburgh-based company was the lowest responsible bid. Borough officials said the project is needed after a small landslide occurred on a portion of the street, affecting a home.

• Accepted a $200,010 bid from Avelli Construction for the Gregg Avenue stairs project. The Ambridge-based company was the lowest responsible bid.

• Advanced a sculpture loan agreement between the borough and Seward Johnson Atelier, Inc. for the lease of outdoor sculptures to be part of the 2025-26 Public Art Bridgeville exhibition.

• Authorized Council President Joseph Verduci to execute permit compliance agreements with the Army Corps of Engineers for the construction of phase 1A of the McLaughlin Run Flood Control Project.

Share

Tags:

About the Writers

Kellen Stepler is a TribLive reporter covering the Allegheny Valley and Burrell school districts and surrounding areas. He joined the Trib in April 2023. He can be reached at kstepler@triblive.com.

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Content you may have missed

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options